Description
Hutter Load Tested Crane Pins prevent crane pin breakage incidents that have been experienced by so many plants in the past (see safety bulletin shown middle above). They greatly enhance your plant’s rigging safety program by switching over to Hutter Load Tested Crane Pins. Pins have their maximum “safe load rating” stamped directly on them to prevent pin overloading. They are load tested and come with load testing documentation, so they can be used as a legal rigging device. Hutter Load Tested Crane Pin have unique design improvements which include:
#1- a straight steel pin design with no stress risers, and #2- a pivoting outer steel sleeve with a cable groove that protects the pin body from cable damage. Potential injuries caused by pin breakage are eliminated because pins are always used with a dynamometer to prevent overloading. Pins reduce critical path outage time by preventing accidents and safety standdowns. Pins fit all turbine OEM couplings with and without recessed windage covers and work equally well on all makes, models, and sizes of steam and gas turbines couplings. Be proactive and eliminate future crane safety accidents by eliminating your old crane pins from your tool crib, which have never been tested, and convert over to Hutter Load Tested Crane Pins and keep your workers safe. |
Recent Comments